---
title: Wall mount
slug: bar/accessories/wall-mount
description: Mount your BUSY Bar anywhere with the Wall Mount accessory, featuring no-drill or screw installation
image: https://archbee-image-uploads.s3.amazonaws.com/3StCFqarJkJQZV-7N79yY/qF4sICAiIe-XF60j869X5_wall-mount-prev.png
docTags: 
createdAt: 2025-05-30T16:59:16.126Z
---

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/Z58e90MrWBpSCO5Y0ttol_wall-mount.png)

Attach your BUSY Bar to a wall or any other flat, smooth surface using the included screws or double-sided tape. You can also attach it to a tripod using the built-in 1/4"-20 UNC thread. Thanks to its built-in rechargeable battery, it doesn’t need to remain plugged in during use.

:::hint{type="info"}
:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/JzzAMWPfMWluW80KVupgz-20260311-152018.png" alt caption width="76" height="88"} <font color="#3182FF">**Wall mount is not included with BUSY Bar**</font>

The wall mount is sold separately — you can get one in the [official shop](https://busy.app/products/wall-mount).
:::

***

# In the box

The wall mount package includes:

- 1 × Wall mount&#x20;
- 2 × Wall screws&#x20;
- 2 × Wall plugs&#x20;
- 2 × Double-sided tape pads&#x20;
- 1 × Locking screw

***

# How to use the wall mount

To install on any surface, follow these two steps: attach the mount, then hang your BUSY Bar and secure it in place.

## Step 1: Attach the wall mount

Installation varies by surface type — select yours below.&#x20;

::::::ExpandableHeading
****:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/4a3-pR1rVN5EUOjj68OFd-20260615-181119.png" alt caption width="96" height="96"}**&#x20;Brick or concrete wall**

For brick or concrete walls, drill two holes, insert wall plugs, and screw the mount into place. Read on for detailed instructions.

**You’ll need:**

- Masking tape *(optional)*
- Level
- Pencil
- Drill with a 4-mm (5/32") bit
- Hammer
- Screwdrivers PH1 and PH2


To attach the mount to a brick or concrete wall:

:::::WorkflowBlock
:::WorkflowBlockItem
*(Optional)* To protect the wall, **place masking tape&#x20;**&#x6F;ver the area where you’ll screw in the mount.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/otUo50KOuXtArFD91B3CM_masking-tape.png)
:::

:::WorkflowBlockItem
**Draw a horizontal line** using a level.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/Qr1lc_vLCoXgx_M0w4i5k_horizontal-line.png)
:::

:::WorkflowBlockItem
**Align the wall mount holes** with the drawn line and **mark the location&#x20;**&#x6F;f the wall mount holes.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/aonTdU_Mf5S1uHU1TVMTk_align-wall-mount.png)
:::

::::WorkflowBlockItem
**Drill two holes** in the marked areas using a drill with a 4-mm (5/32") bit. The hole depth should be at least 20 mm (0.8 in).

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/1eR-jdIo4rtZqZiFy8r7s_drill-4mm.png)

:::ExpandableHeading
*How can I ensure that I drill to the required depth?&#x20;*:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/BnDmvlxd6fDnLVlZlpBnN-20260615-181604.png" alt caption width="96" height="96"}

Measure 20 mm (0.8 in) from the tip of the drill bit and wrap a piece of tape around the bit at that point. Drill until the tape reaches the wall. The tape serves as a visual depth marker.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/qNYTBQxVwxf2SBonu5jdq_how-to-measure-drilling-depth-20-mm.jpg)
:::
::::

:::WorkflowBlockItem
**Insert the two provided wall plugs** into the drilled holes.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/rqcGn3X7Bxg8evNC1Imbq_wall-plugs.png)
:::

:::WorkflowBlockItem
*(Optional)* **Remove the masking tape**, if used.
:::

:::WorkflowBlockItem
**Screw the wall mount** with the provided screws using the PH2 screwdriver.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/osajVoMAAT2Wuhfx8DGbv_screw-mount.png)
:::
:::::

:::hint{type="warning"}
:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/SrCtVrz3YrrtWV8UIOJIA-20260306-143018.png" alt caption width="117" height="100"} <font color="#FAAB01">**Warning**</font>

Make sure each screw is fully **tightened and seated in the recess**. Otherwise, it may scratch the back cover of the BUSY Bar.
:::
::::::

::::::ExpandableHeading
:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/xNGlfY0Zb1wr8wdNAswho-20260615-181118.png" alt caption width="96" height="96"}**&#x20;Wooden wall**

For wooden walls, drill two holes and screw the mount into place — detailed instructions below.

**You’ll need:**

- Masking tape *(optional)*
- Level
- Pencil
- Drill with a 2-mm (5/64") bit
- Screwdrivers PH1 and PH2



To attach the mount to a wooden wall:

:::::WorkflowBlock
:::WorkflowBlockItem
*(Optional)* To protect the wall, **place masking tape&#x20;**&#x6F;ver the area where you’ll screw in the mount.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/NYG7lnIA-5LbrFfADKX11_masking-tape-wood.png)
:::

:::WorkflowBlockItem
**Draw a horizontal line** using a level.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/k3YI385hkk5DzmrpReJF6_horizontal-line-wood.png)
:::

:::WorkflowBlockItem
**Align the wall mount holes** with the drawn line and mark the location of the wall mount holes.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/4WAxsvaQivj0bVX08D8wx_align-wall-mount.png)
:::

::::WorkflowBlockItem
**Drill two holes** in the marked areas using a drill with a 2-mm (5/64") bit. The hole depth should be at least 17 mm (0.7 in).



![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/6J79gtpBwMDHlXZ9bM23L_drill-2mm.png)

:::ExpandableHeading
*How can I ensure that I drill to the required depth?&#x20;*:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/BnDmvlxd6fDnLVlZlpBnN-20260615-181604.png" alt caption width="96" height="96"}

Measure 17 mm (0.7 in) from the tip of the drill bit and wrap a piece of tape around the bit at that point. Drill until the tape reaches the wall. The tape serves as a visual depth marker.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/u-LusZiPybuenDD25cFKL_how-to-measure-drilling-depth-17-mm.jpg)
:::
::::

:::WorkflowBlockItem
*(Optional)* **Remove the masking tape**, if used.
:::

:::WorkflowBlockItem
**Screw the wall mount** with the provided screws using the PH2 screwdriver.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/rIr5kQughHm38paXpCVPa_screw-mount.png)
:::
:::::

:::hint{type="warning"}
:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/SrCtVrz3YrrtWV8UIOJIA-20260306-143018.png" alt caption width="117" height="100"} <font color="#FAAB01">**Warning**</font>

Make sure each screw is fully **tightened and seated in the recess**. Otherwise, it may scratch the back cover of the BUSY Bar.
:::
::::::

::::::ExpandableHeading
:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/r_D5BepNwwicslpIX9Y99-20260615-181118.png" alt caption width="96" height="96"} **Other surfaces (no drilling)**

The wall mount includes two double-sided tape pads for mounting on smooth, flat surfaces such as glass, tile, or metal without drilling. Apply the tape pads to the back of the wall mount, then attach the mount to the flat surface.

**You’ll need:**

- Rubbing alcohol
- Dry cloth
- Level
- Temporary marker
- Screwdriver PH1

<u>******</u>

Prepare the wall mount by applying the double-sided tape pads:

::::WorkflowBlock
:::WorkflowBlockItem
**Clean the back of the wall mount&#x20;**&#x77;ith rubbing alcohol, then let it dry.
:::

:::WorkflowBlockItem
**Peel off the backing paper** from one side of the double-sided tape pads.&#x20;
:::

:::WorkflowBlockItem
**Apply the double-sided tape pads** to the back of the wall mount as shown below, then press them firmly.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/VTystryk0jTjL7ZyIMMgo_tape-mount-step-1.png)
:::
::::



To attach the mount to the flat surface:

:::::WorkflowBlock
:::WorkflowBlockItem
**Clean the surface** with rubbing alcohol and let it dry.
:::

::::WorkflowBlockItem
*(Optional)* **Hold the wall mount** in place, **level it horizontally** using a level (or a phone level), then **mark the position** with a temporary marker.

:::hint{type="warning"}
:inlineImage[]{src="https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/SrCtVrz3YrrtWV8UIOJIA-20260306-143018.png" alt caption width="117" height="100"} Avoid using a permanent marker — it’s difficult to clean off later.
:::

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/PVwwRcNKdBxT0wbtBSl3y_no-drill-position.png)
::::

:::WorkflowBlockItem
**Peel off the backing paper** from the double-sided tape pads on the wall mount in two places.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/bvD3DPkj1fw0vCPNmu37e_tape-mount-step-2.png)
:::

:::WorkflowBlockItem
**Press down** the wall mount against the wall in the marked area **for 30 seconds** to ensure maximum adhesion.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/7MbEa7Xju1cttUEAS5Kps_press-down-30s.png)
:::

:::WorkflowBlockItem
*(Optional)* **Wipe off any drawn outline** with a cloth, if drawn.
:::

:::WorkflowBlockItem
**Leave the wall mount on the wall for 1 hour** before attaching the BUSY Bar. This allows the adhesive to bond and reach maximum strength.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/yVLaFcGzuo188NkMuwFEy_leave-1h.png)
:::
:::::
::::::

***

## Step 2: Mount your BUSY Bar

::::WorkflowBlock
:::WorkflowBlockItem
**Hang the BUSY Bar** on the wall mount.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/uuXHonl8W0dcbDO6daGm4_hang-busy-bar.png "The back of the BUSY Bar has slots for the mount hooks")
:::

:::WorkflowBlockItem
**Secure the BUSY Bar** to the wall mount using the provided locking screw and the PH1 screwdriver.

![](https://api.archbee.com/api/optimize/3StCFqarJkJQZV-7N79yY/ahrqizkMZ9ntxSrpgKH2__locking-screw.png)
:::
::::



